Skip to main content

Transparency

Village construction roadmap

Bliss Estates is a planned community of twenty private cabin homes for adults 50+ at 18129 Hwy HH, Audrain County, Missouri (Hwy HH & Audrain Rd 939). This page tracks physical construction — not our marketing website.

Last updated: June 10, 2026

Living document. Mike and Stacy update this page as engineering, utilities, and cabin work move forward on the property. Photos and target dates will be added when available.

Construction timeline

Where we are today on the ground at Bliss Estates — from engineering and cabin plans through the first homes and full village build-out.

  1. Village vision & property

    Twenty ground-level cabin homes with carports on Hwy HH country — a calm 50+ village with community building, on-site staff, and shared amenities planned in phases.

    Complete
  2. Civil engineering & site layout

    Christina Luebbert, P.E. (Luebbert Engineering) engaged to plan, design, and supervise construction — master layout, waterline locations, and sanitary sewer routing.

    Updated layout drawings and sewer sketches in progress (May 2026).

    In progress
  3. Cabin plans & vendor coordination

    16×26 cabin-style homes through Backyard & Beyond — floor plans, carport, accessible step or ramp at the entry, stackable laundry, and utility stub-out locations for slab work.

    Plan revisions through V1.3; plumbing locations coordinated with Cole (sewer & drain). Bird's-eye slab view still pending for final handoff.

    In progress
  4. Electric, water & sewer coordination

    200-amp electric service per home from existing poles at the Hwy HH corner (Consolidated Electric); water and sanitary sewer tie-ins aligned with engineer and plumber drawings.

    Service cost and installation timeline under discussion with the utility (May 2026).

    In progress
  5. Bids & per-home cost planning

    Collecting contractor and vendor bids to finalize the cost picture for each home before breaking ground.

    In progress
  6. Slab foundations

    Concrete pads poured to finalized plans — sewer, water, and electrical stub-outs in place before cabins are set.

    No concrete poured yet — awaiting final plan package for the concrete contractor (May 2026).

    Planned
  7. First cabin homes (sites 16–20)

    Initial construction wave: five cabin homes built first at the corner of Hwy HH and Audrain Rd 939, then expanded across the village.

    Planned
  8. Phase 1 village infrastructure

    Community building, manager residence, wastewater system, and on-site storage supporting the first group of homes.

    Planned
  9. Remaining homes & village finish

    Homes 1–15, community garden, trails, and additional amenities as the full twenty-home village takes shape.

    Planned
  10. Tours & first households

    Property tours, application review, and welcoming the first Bliss Estates residents.

    Planned

Questions or a site tour?

We welcome inquiries while the village takes shape. Apply online or reach out — we will keep you informed as milestones on this page are updated.

← Back to home